When you buy less quantity

When we went to the housewarming function shopping, we bought window and door curtains from Chikkapete.

My dad roughly calculated the required curtains, and we bought only that many.

We didn’t put those bought curtains immediately…

We thought after the function we would put it as we postponed it.

Read more

Material Shifting Tips

If you are building a multi-floor building that is bigger in size, then shifting materials with manual labourers may not be the right solution.

In manual labourers, shifting materials takes time, and labourers easily get tired of climbing staircases.

I sometimes feel it is an inhuman way to do work. So we went with material shifting with Gang.

Read more

Bigger Vehicle Problem

A brick unloader vehicle came backside our house.

It’s a bigger vehicle.

While returning, the vehicle damaged another house drainage stone.

Immediately house owner’s wife and neighbour’s ladies gang came and did a spot inspection ?

The construction house owner’s son and vehicle driver were both where staying there. 

The owner’s wife called the owner’s son and told him in a good way about the damage.

Read more

While spending, keep this in mind

One important thing I recommend you to keep in mind is that until plastering work is over you don’t need more money.

The real picture starts during the finishing time of your building.

If in case you thought…

We still have plenty of money left and start spending on expensive things. Then you may end up with a problem during finishing time.

Read more

DP Switch story

One of our tenant’s DP switches was not working, so we asked him to bring a new switch to replace it.

He went to store and bought it immediately.

I asked him how much it cost. He replied ₹185.

Within 3 days, we also bought the same switch for ₹123—no bargain… nothing.

We bought only 6 switches, so definitely, it’s not bulk order pricing.

Then why the price is so big difference?

Read more