Once PCC bedding is done, the next step is installing Reinforced Mat Laying and Column/Pillar standing.

The Barbender team will come and prepare those steel mats.

While preparing those Mats and pillars, your building contractor will mark the pillar’s exact location with the help of thread as per the engineer’s plan.

First, your building contractor will tie thread all over the site wherever the pillars come. After properly positioning the thread where the pillar comes, he will put some cement and Msand mixture to mark the pillar’s exact location.

In the below images, those markings are covered by empty cement bags due to rain.

Before placing the pillars, they removed the cement cover and place it where the marking was done.

barbender team steel material

barbender team steel material

thread tied for pillar location marking

thread tied for pillar location marking

pillar location marking with thread

pillar location marking with thread

building contractor marking pillar location as per engineer plan

building contractor marking pillar location as per engineer plan

thread tied allover site

thread tied allover site

pillar location marking end setup

pillar location marking end setup

pillar location marked with cement pillar location marked with cement

pillar mat

pillar mat

barbender preparing mat and pillars

barbender preparing mat and pillars

pillar mat and pillar fixed in it’s location

pillar mat and pillar fixed in it’s location

inside view of pillar mat before concreting

inside view of pillar mat before concreting