A few days back, a new construction building near my house shifted materials with a Gang/Machine to the 2nd floor RCC. This method is what I recommend for 2nd-floor and above-floor construction. They were shifting Concrete Blocks for the construction of the 3rd floor. I remember once my dad and I roughly calculated the cost of material shifting with the Gang team and with manual labour. We noticed both costs are almost the same....